  • user warning: Table './ppDrupalDB/cache_filter' is marked as crashed and last (automatic?) repair failed query: UPDATE cache_filter SET data = '<p>Hello Peek Forum,</p>\n<p>I want to set up actuated-coordinated operation in a 3000E controller (3.7.3). I have a test setup with a master and one controller running a 100 second cycle length. The controller is actuated with a NEMA tester. For Peek, it seems that I should use the RGB and/or EGB (I am only using RGB - I only want the coordinated phase to gap out). I tinkered with the setup and at one point got it to work. It would return to main street green at the proper time and run what appeared to be the min time. It would operate actuated for the rest of the cycle. If calls where present all around it would run to the splits. I then switch to a shorter cycle length and it failed. I switched back to the original cycle length and it didn\'t work (and hasn\'t\' since). </p>\n<p>So, would you explain how to setup actuated coordinated operation using RGB and EGB (and if not by RGB/EGB then how?). What other settings have to be in enabled/disabled for RGB/EGB to function? </p>\n<p>Do I need to restart the controller for any of these types of setups to get them to function? </p>\n<p>I would be happy with a working example that I can study. If needed I can send you my database. </p>\n<p>Thanks for your time, Joe</p>\n', created = 1582206196, expire = 1582292596, headers = '', serialized = 0 WHERE cid = '1:d2b30cefa7fadf0dd0f685d566e5dd0d' in /var/www/peektraffic.com/portal/includes/cache.inc on line 112.

3000E - Actuated Coordinated

JosephD's picture

Hello Peek Forum,

I want to set up actuated-coordinated operation in a 3000E controller (3.7.3). I have a test setup with a master and one controller running a 100 second cycle length. The controller is actuated with a NEMA tester. For Peek, it seems that I should use the RGB and/or EGB (I am only using RGB - I only want the coordinated phase to gap out). I tinkered with the setup and at one point got it to work. It would return to main street green at the proper time and run what appeared to be the min time. It would operate actuated for the rest of the cycle. If calls where present all around it would run to the splits. I then switch to a shorter cycle length and it failed. I switched back to the original cycle length and it didn't work (and hasn't' since).

So, would you explain how to setup actuated coordinated operation using RGB and EGB (and if not by RGB/EGB then how?). What other settings have to be in enabled/disabled for RGB/EGB to function?

Do I need to restart the controller for any of these types of setups to get them to function?

I would be happy with a working example that I can study. If needed I can send you my database.

Thanks for your time, Joe